  • SEI Dinner: District 11 Accelerated Bridge Replacement Project

Event Details

SEI Dinner: District 11 Accelerated Bridge Replacement Project

  • 11 May 2017
  • 5:00 PM
  • Gaetano's Event and Banquet Center, 1617 Banksville Rd, Pittsburgh, PA 15216

Registration


Registration is closed
The Pennsylvania DOT replaced the SR 30 over Bessemer Avenue Bridge in a 57-hour closure over a weekend in May 2016.


The Accelerated Bridge Construction (ABC) elements in this project are precast concrete abutment caps, modular decked beams, and precast concrete approach slabs. Each modular decked beam consists of two steel I-girders with composite deck. Traffic barriers were cast with the decks in two of the six modular decked beams that form the single-span superstructure. The six modular decked beams were connected with ultra-high performance concrete (UHPC) deck joints. The contractor was able to complete the work despite heavy rains during half of the weekend. This presentation includes design and construction details as well as lessons learned.

1 PDH will be provided. 

Social Hour: 5:00pm
Dinner: 6:00pm
Presentation: 7:00pm

Speakers include Robert Bistline, PE, VP of HNTB and James Anderson, PE of HNTB.